Every regulation, packaged
as a ready-to-use kit.
For each regulatory development we track, you get the original notification, a plain-English one-pager, and an editable whitelabel PPT slide — ready to drop into your own board deck or client briefing.
Every CERC regulation that matters for tariff, deviation settlement, ancillary services and renewable certificates — gazette to amendment, in one place.
CERC Cross Border Trade of Electricity Regulations, 2019
Governs every import and export of electricity across India's borders — the Designated Authority approval pathway, Connectivity/GNA/T-GNA access, CBTL planning, tariff and the SNA Charge, and payment security — as rewritten by the 2025 Second Amendment to align with the newer GNA Regulations.
Source Files
- 1. MoP Guidelines on Cross Border Trade of Electricity, 2016 (original framework, since superseded)
- 2. MoP Guidelines for Import/Export (Cross Border) of Electricity, 2018
- 3. Addendum to the 2018 Guidelines, dated 03.07.2019
- 4. CERC CBTE Regulations, 2019 — Notification dated 08.03.2019
- 5. CERC CBTE Regulations, 2019 — Gazette No. 160, dated 14.05.2019
- 6. CERC CBTE Regulations, 2019 — Statement of Reasons
- 7. Designated Authority Procedure for Approval & Facilitation — issued 26.02.2021
- 8. DA Procedure — Amendment-I, dated 31.07.2023
- 9. CERC CBTE (First Amendment) Regulations, 2023 — Notification dated 15.12.2023
- 10. First Amendment, 2023 — Gazette, dated 26.12.2023
- 11. First Amendment, 2023 — Statement of Reasons
- 12. MoP Guidelines Amendment, 2024 (OM dated 12.08.2024)
- 13. DA Procedure — Amendment-II, reflecting the 12.08.2024 MoP OM
- 14. CERC CBTE (Second Amendment) Regulations, 2025 — Notification dated 09.12.2025
- 15. Second Amendment, 2025 — Gazette, dated 09.12.2025
- 16. Second Amendment, 2025 — Statement of Reasons, dated 08.02.2026New
- 17. Consolidated CBTE Regulations, 2019 (incl. First & Second Amendments) — reference copy
FAQs
Which commencement date should I cite? 14 May 2019 (Gazette No. 160). Regulation 1(2) provides that these regulations come into force from the date of Gazette publication — not the 8 March 2019 notification date, which is when CERC signed them.
What's the difference between the First and Second Amendments? The First Amendment (2023) is narrow — it only introduced the SNA Charge. The Second Amendment (2025) is a near-total rewrite: it replaces the legacy LTA/MTOA/STOA access terminology with GNA/T-GNA and widens the Applicant definition, touching roughly 20 of the regulation's 37 operative clauses.
What is the SNA Charge? 0.50 paisa (half paisa) per kWh on the energy scheduled, payable by participating entities located in the neighbouring countries to the Settlement Nodal Agency (Regulation 30(2), introduced by the First Amendment, 2023).
What is the CTU "Due Date"? The 45th day from presentation of the bill raised by the Central Transmission Utility. It's a term that didn't exist in the original 2019 text — it was newly defined by the 2025 Second Amendment (Regulation 2(x-i)).
CERC (Power Market) Regulations, 2021
Governs short-term power trading on Power Exchanges and the OTC Market — contract types, exchange registration & ownership caps, fee ceilings, market oversight powers, and the market coupling framework now being rolled out.
Source Files
- Principal Regulations — Notification dated 15.02.2021
- Principal Regulations — Gazette No. 241, dated 16.06.2021
- Statement of Reasons
- Commencement Notification — effective 15.08.2021
- Commencement Gazette — No. 327, dated 15.08.2021
- OTC Platform Registration Guidelines, 2022
- OTC Guidelines — Gazette No. 267, dated 19.05.2022
- OTC Guidelines — Statement of Reasons
- Order 8/SM/2025, dated 23.07.2025 — shadow-pilot & round-robin MCO directions
- Draft First Amendment, 2025 — Notification
- Draft First Amendment, 2025 — Explanatory Memorandum
- Draft Second Amendment, 2026 — Notification, dated 17.04.2026New
FAQs
Is market coupling live yet? No. It remains in a shadow-pilot/simulation phase run by Grid India. The Draft Second Amendment, 2026 would make Grid India the sole permanent Market Coupling Operator, but it has not been notified.
What did the Supreme Court decide on 3 August 2026? It dismissed a legal challenge to market coupling brought by IEX as premature, without ruling on the merits. CERC told the Court notification of the Second Amendment was 4–6 weeks away — a window that has since passed with no Sl. No. yet assigned.
Which commencement date should I cite for PMR 2021? 15 August 2021 (Gazette No. 327). The regulation was notified 15 February 2021 and published in the Gazette on 16 June 2021 (No. 241), but it came into force on 15 August 2021.
What's the fee cap for exchanges and facilitators? Both the transaction fee and the Facilitator service charge are capped at 2 paise/kWh (Regs. 23–24).
Terms and Conditions of Tariff Regulations, 2024
Governs tariff determination for Thermal, Hydro, Transmission and Integrated Mine assets owned/controlled by Government companies, for the 6th control period.
Source Files
- 1. Gazette (No. 187 dated 01.07.2024)
- 2. Notification dated 15.03.2024
- 2a. Corrigendum dated 09.04.2024
- 3. Statement of Reasons dated 11.07.2024
- 4. Tariff Filing Forms — Part I: Thermal (Forms 1–20, A–T)
- Part II: Hydro (Forms 1–19, Info 1–11)
- Part III: Transmission (Forms 1–15, Form A, Info 1–10)
- Part IV: Integrated Mines (Forms 1–18, A–N, Docs 1–10)
- 5. First Amendment (Sl.no.197) — Gazette dated 11.04.2025
- Notification dated 04.02.2025
- Order — Procedure for Compensation due to Part Load Operation, dated 14.07.2025
- 6. Second Amendment (Sl.no.206) — Gazette dated 10.04.2026New
- Notification dated 10.04.2026
FAQs
What are Tariff Regulations? The primary regulations for determination of tariff of Thermal Stations, Hydro Stations, Transmission Systems and Integrated Mines owned/controlled by Govt. companies, under Section 62 read with Section 79 of the Electricity Act.
What is the control period? Five years, except the first (3 years). Currently in the 6th control period, 2024–29. Earlier periods: 2019–24, 2014–19, 2009–14, 2004–09, 2001–04.
Deviation Settlement Mechanism & Related Matters Regulations, 2024
Latest DSM framework, rolled out in phases through 2024 and amended three times since — refining settlement charges, timelines, and infirm-power treatment (thermal, and now standalone storage), the deviation-computation value “X” for Wind & Solar sellers, and — per the Third Amendment, 2026 — a new WS/General-Seller parity rule and a Pumped Hydro deviation rate.
Source Files
- 1. Gazette (No. 642 dated 21.08.2024)
- 2. Notification dated 05.08.2024
- 2a. Errata dated 18.11.2024 (Gazette No. 946)
- 3. Gazette — effective date 16.09.2024 (Gazette No. 712)
- Notification — effective date 16.09.2024
- 4. Gazette — effective date 16.09.2024, except Regulation 8(8) (Gazette No. 766)
- Notification — effective date 16.09.2024, except Regulation 8(8)
- 5. Detailed Procedure for recovery of charges in case of deficit in the Deviation and Ancillary Service Pool Account (Order dated 15.10.2024)
- 6. Gazette — effective date 01.12.2024, for Regulation 8(8) (Gazette No. 899)
- Notification — effective date 01.12.2024, for Regulation 8(8)
- 7. Statement of Reasons dated 15.11.2024
- 8. Gazette — effective date 23.12.2024, for Regulation 8(8)
- Notification — effective date 23.12.2024, for Regulation 8(8)
- 9. First Amendment (Sl.no.194) — Gazette dated 24.12.2024
- Notification dated 17.12.2024
- Statement of Reasons dated 17.12.2024
- 10. Second Amendment (Sl.no.199) — Gazette dated 02.07.2025
- Notification dated 25.06.2025
- Statement of Reasons dated 14.11.2025
- 11. Order in Petition No. 9/SM/2025 — Determination of value of “X” for computation of the deviation (in %) for Wind and Solar (WS) Sellers from 01.04.2026 onwards, dated 31.03.2026
- 12. Third Amendment (Sl.no.208) — Notification dated 25.08.2026New
- Statement of Reasons dated 25.08.2026
FAQs
Where did DSM come from? Originally Unscheduled Interchange Charges, folded into Tariff Regulations (2004–09, 2009–14). Split into standalone DSM Regulations in 2014, with a major structural update in November 2015 for renewable generators.
Why so many effective dates? The 2024 regulation was rolled out in stages: most provisions took effect 16.09.2024, Regulation 8(8) (deficit recovery from the Deviation & Ancillary Service Pool) followed on 01.12.2024 and then 23.12.2024 once the Detailed Procedure was approved (15.10.2024). The First Amendment (Dec 2024) and Second Amendment (notified 25.06.2025, gazetted 02.07.2025) followed, the latter letting thermal generators recover infirm power at the Normal Rate of Charges for Deviations, capped at ₹2.86/kWh. Most recently, a Commission order dated 31.03.2026 fixed the deviation-computation value “X” for Wind & Solar sellers from 01.04.2026.
What changed in the Second and Third Amendments? The Second Amendment (notified 25.06.2025, gazetted 02.07.2025, effective 01.07.2025) let thermal generating stations recover infirm power — from first synchronisation to successful trial-run completion — at the Normal Rate of Charges for Deviations, capped at ₹2.86/kWh (Regulation 8(8)). The Third Amendment (notified 25.08.2026, effective 31.08.2026) made four further changes: a WS/General-Seller parity rule under which a Wind & Solar Seller is treated as a General Seller for deviation if its project is bid/tendered on or after 01.01.2027, or (for non-bid projects) commissioned on or after 01.01.2029 (new Clause 4A, Regulation 8); a dedicated deviation rate for standalone Pumped Hydro Storage Projects, set at the energy charge rate under Regulation 66(3) of the CERC Tariff Regulations, 2024, in place of a contract rate; infirm-power compensation for standalone Energy Storage Systems, at the Normal Rate capped at ₹2.00/kWh (new Clause 2A, Regulation 8); and payment-timeline flexibility under Regulation 10, letting a Commission-approved Detailed Procedure set an alternative to the default 10-day payment window.
Deviation Settlement Mechanism & Related Matters Regulations, 2022
Superseded by the 2024 regulations above — retained here for reference on POSOCO's normal-rate methodology and related CERC orders.
Source Files
- 1. Gazette (No. 147 dated 22.03.2022)
- 2. Notification dated 14.03.2022
- 3. Statement of Reasons dated 01.06.2022
- 4. Notification dated 31.10.2022 — effective date 05.12.2022
- 5. Methodology for Normal Rate — Version 3, 16.01.2023
- 6. CERC Order dated 26.12.2022 in 16/SM/2022
- 7. CERC Order dated 06.02.2023 in 1/SM/2023
FAQs
Is this still in force? No — superseded by the DSM Regulations, 2024 (Sl.no.192) above. Kept here as an archive since several 2022-era CERC orders still reference it.
Ancillary Services Regulations, 2022
Framework for procurement, deployment and payment of ancillary services at regional and national level, to hold grid frequency near 50 Hz and relieve transmission congestion. PRAS and SRAS came into force 05.12.2022; TRAS (Regulations 6, 14–19, 20–22 & 26) followed on 01.04.2023.
Source Files
- 1. Gazette (No. 85 dated 12.02.2022)
- 2. Notification dated 31.01.2022
- 3. Statement of Reasons dated 26.04.2022
- 4. Notification dated 31.10.2022 — PRAS/SRAS effective 05.12.2022
- Effective-Date Gazette (No. 546, 05.12.2022)
- 5. Notification dated 15.02.2023 — TRAS effective 01.04.2023New
- Effective-Date Gazette (No. 100, 01.04.2023)
- 6. Detailed Procedure for SRAS, dated 05.12.2022 (Grid-India)
FAQs
What is ancillary services in power generation? Functions that help grid operators maintain a reliable system — managing the flow and direction of electricity, addressing supply-demand imbalances, and helping the grid recover after an event.
What types are covered, and when did each take effect? Primary (PRAS) and Secondary (SRAS) reserve ancillary services took effect 05.12.2022; Tertiary (TRAS) followed on 01.04.2023 once its Detailed Procedure was finalised. Other services such as voltage control and black start are specified separately in the Grid Code.
Renewable Energy Certificates — Terms & Conditions Regulations, 2022
Supersedes the 2010 REC Regulations; removes the forbearance and floor price ceiling for RE Certificates. Amended in 2026 to recognise Virtual PPAs and overhaul the Certificate Multiplier.
Source Files
- 1. Gazette (No. 272 dated 24.05.2022)
- 2. Notification dated 09.05.2022
- 3. Statement of Reasons dated 11.06.2022
- 4. Notification dated 31.10.2022 — effective 05.12.2022
- 5. Detailed Procedures for REC Mechanism Implementation — Modified, Revision 3, effective 01.04.2024
- 6. First Amendment (Sl.no. 207) — GazetteNew
- Notification dated 24.03.2026
FAQs
What changed from the 2010 regulations? CERC notified these on 09.05.2022 in supersession of the 2010 REC Regulations, removing the forbearance and floor price ceiling that previously capped and floored REC prices.
What changed in the First Amendment, 2026? It recognises Virtual Power Purchase Agreements for the first time (new Regulation 14A), widens which self-consumption plants qualify as captive, shifts the REC application deadline for obligated entities to the State Commission's certification date, and replaces the old tariff-only Certificate Multiplier with a 3-factor weighted score — raising the multiplier for offshore wind (4.0x) and storage/firm technologies (3.0x).
Installation and Operation of Meters — Fifth Amendment Regulations, 2026
Refines the 2019 Smart Meter mandate and 2022 AMI/AMISP framework: all Advanced Metering Infrastructure must now include prepayment and interoperability, and a Smart Meter of accuracy class 1.0/0.5S can double as the Interface Meter for open-access consumers at or below 650 V.
Source Files
- 1. Gazette — Principal Regulations, 2006 (No. 502/70/CEA/DP&D, 22.03.2006)
- 2. Amendment Regulations, 2010 — meter location (No. 502/6/2009/DP&D/D-I, 04.06.2010)
- 3. Amendment Regulations, 2014 — Renewable Energy Meter (No. 23/47/2014-R&R(Vol.III), 26.11.2014)
- 4. Amendment Regulations, 2019 — Smart Meter mandate (No. CEA-GO-13-15/3/2019-DPR, 23.12.2019)
- 5. Amendment Regulations, 2022 — AMI/AMISP framework (No. CEA-GO-13-15(12)/1/2022-DPR, 28.02.2022)
- 6. Fifth Amendment Regulations, 2026 — Gazette (No. 1/12/CEA/DPM/Regulations/2025, 01.04.2026)New
- Notification dated 01.04.2026
- Corrigendum dated 10.04.2026
FAQs
What does the 2026 Amendment actually change? It rewrites Regulation 4(1)(b) so all Advanced Metering Infrastructure must include prepayment functionality and be interoperable, and lets a Smart Meter of accuracy class 1.0/0.5S double as the Interface Meter for open-access consumers at or below 650 V. It also splits Regulation 7's Table-1 (Sl. No. 4 & 5) cleanly at the 650 V threshold for Main/Check Meter placement.
Is the 10 April 2026 Corrigendum a substantive change? No — it's a Hindi-text translation fix and an English typo correction (“pentries” → “entries”) only. The 1 April 2026 operative rules are unchanged in substance.
Cyber Security in Power Sector — CEA Regulations, 2026
India's first sector-specific cyber security framework for the power system: mandatory CISO/Alternate CISO governance, physical OT/IT segregation, 6-hour incident reporting to CSIRT-Power & CERT-In, annual audits and vendor cyber security obligations — for entities that own, operate or manage OT/IT infrastructure tied to the grid, generation, captive plants and ESS at or above 50 MW.
FAQs
Who does this regulation apply to? Generating companies, captive generating plants & Energy Storage Systems with installed capacity ≥ 50 MW, transmission & distribution licensees, National/Regional/State Load Despatch Centres, and power exchanges/OTC platforms (except Regulations 6, 11 & 12) that own, operate or manage OT infrastructure tied to the interconnected power system, plus their connected IT infrastructure. Entities below 50 MW are encouraged, not mandated, to adopt CERT-In's "15 Elemental Cyber Defense Controls for MSMEs" as a minimum baseline.
What are the key compliance timelines? Cyber security incidents must be reported to CSIRT-Power and CERT-In within 6 hours (24 hours for confirmed cyber sabotage of critical systems). Cyber security audits must be completed within 6 weeks of commencement, with critical/high-risk findings fixed within 1 month and medium/low-risk findings within 3 months. The regulations come into force from 1 April 2027, though select sub-regulations (5(9), 5(24), 5(33), 5(39), 6(2), 6(7)) commence on dates to be separately notified.
Flexible Operation of Coal-based Thermal Power Generating Units — CEA Regulations, 2023
Mandates minimum turndown to 40% of Maximum Continuous Rating (interim 55% within one year of notification) and graded ramp-rate capability of 1–3% per minute across load bands, for every coal-based thermal generating unit connected to the grid — with Authority-directed phased timelines and case-by-case relaxation power.
FAQs
Who does this regulation apply to? All coal-based thermal power generating units connected to the grid — whether owned or controlled by the Central Government, State Governments, or any private company — and the load despatch centres responsible for scheduling them, covering both existing and new units.
What are the key compliance timelines? Units must achieve a minimum power level of 40% of Maximum Continuous Rating (MCR) without oil support, with units not yet compliant required to reach an interim 55% MCR within one year of notification (30 January 2023). Ramp rates must reach at least 3%/min between 70–100% MCR, 2%/min between 55–70% MCR, and 1%/min between 40–55% MCR (phased), with the Authority prescribing unit-wise implementation timelines and case-by-case relaxations by reasoned order.
Technical Standards for Construction of Electrical Plants & Electric Lines — CEA Regulations, 2022 (as amended 2025 & 2026)
Core construction standards for generating stations, sub-stations and electric lines (2022), tightened by the 2025 amendment standardising Right-of-Way values under a rebuilt Schedule VII, and expanded by the 2026 amendment's new Chapter VI (Regs 106A–106ZS) setting dedicated technical standards for solar, wind and Battery Energy Storage System (BESS) installations.
Source Files
- 1. Gazette — CEA (Technical Standards for Construction of Electrical Plants and Electric Lines) Regulations, 2022 (No. 8672 GI/2022(1), Gazette of India Extraordinary Part III—Section 4, 27.12.2022)
- 2. Amendment Regulations, 2025 — Right-of-Way (Regulation 84(4) & Schedule VII), notified 09.10.2025
- 3. Amendment Regulations, 2026 — Chapter VI, Renewable Energy & BESS (No. 413, Gazette of India Extraordinary Part III—Section 4, 23.06.2026)New
FAQs
Who does this regulation apply to? Generating companies, transmission & distribution licensees, CTU and STUs building or operating electrical plants, sub-stations, switchyards and electric lines (2022 base). From the 2026 amendment, the same technical-standards discipline extends to solar (including floating solar), onshore & offshore wind, and BESS developers — covering Parts A, A1, B, B1 and C of the new Chapter VI.
What changed across the three notifications? The 2022 base regulation lays down chapter-wise standards for General, Thermal, Hydro-Electric, Sub-stations & Switchyards, Electric Lines and HVDC works. The 2025 amendment substitutes Schedule VII with Right-of-Way values keyed to voltage class, conductor, terrain and approach-section — any new conductor configuration or technology needs separate CEA approval. The 2026 amendment inserts Regulations 106A–106ZS, mandating ≥25-year design life, AWS & PMU integration, and use-case-specific technical requirements for RE and BESS assets (including AGC, grid-forming inverters and black-start capability for BESS ≥50 MW), coming into force 1 April 2027.
Tracking a regulation not listed here? Tell us what to add — or go Premium for ready-made PPT and editable kits on every entry.