PPTs & Kits

● LIVE CERC proposes Grid-India as Market Coupling Operator / DSM tighter RE deviation norms take effect 01 Apr 2026 / Draft Electricity (Amendment) Rules 2026 rework captive generation / CERC recognises Integrated Energy Storage as a regulated asset /
PREMIUM · PPTs & KITS

Every regulation, packaged
as a ready-to-use kit.

For each regulatory development we track, you get the original notification, a plain-English one-pager, and an editable whitelabel PPT slide — ready to drop into your own board deck or client briefing.

Original Document
The exact gazette notification, order or judgment — unedited, as published by the regulator.
One-pager Summary
Our plain-English breakdown of what changed, who it affects, and what to do next.
Whitelabel PPT
A fully editable, rebrandable slide — drop your own logo and present it as your own analysis.
📖
Compendium of Definitions
Search 1,266 defined terms across the Electricity Act, MoP Rules, CEA Regulations & CERC Regulations — a quick-reference companion to the kits below.
Open Compendium →
Regulatory Library

Every CERC regulation that matters for tariff, deviation settlement, ancillary services and renewable certificates — gazette to amendment, in one place.

CERC Sl. No. 213
Cross Border Trade · In force 14.05.2019

CERC Cross Border Trade of Electricity Regulations, 2019

Governs every import and export of electricity across India's borders — the Designated Authority approval pathway, Connectivity/GNA/T-GNA access, CBTL planning, tariff and the SNA Charge, and payment security — as rewritten by the 2025 Second Amendment to align with the newer GNA Regulations.

FAQs

Which commencement date should I cite? 14 May 2019 (Gazette No. 160). Regulation 1(2) provides that these regulations come into force from the date of Gazette publication — not the 8 March 2019 notification date, which is when CERC signed them.

What's the difference between the First and Second Amendments? The First Amendment (2023) is narrow — it only introduced the SNA Charge. The Second Amendment (2025) is a near-total rewrite: it replaces the legacy LTA/MTOA/STOA access terminology with GNA/T-GNA and widens the Applicant definition, touching roughly 20 of the regulation's 37 operative clauses.

What is the SNA Charge? 0.50 paisa (half paisa) per kWh on the energy scheduled, payable by participating entities located in the neighbouring countries to the Settlement Nodal Agency (Regulation 30(2), introduced by the First Amendment, 2023).

What is the CTU "Due Date"? The 45th day from presentation of the bill raised by the Central Transmission Utility. It's a term that didn't exist in the original 2019 text — it was newly defined by the 2025 Second Amendment (Regulation 2(x-i)).

Ready-made kits: 📄 PPT Deck (PDF, Free) 📄 One-Pager (PDF, Free) Premium members get the editable files below. Upgrade to unlock → You must be logged in to view this content.
CERC Sl. No. 212
Power Market · In force 15.08.2021

CERC (Power Market) Regulations, 2021

Governs short-term power trading on Power Exchanges and the OTC Market — contract types, exchange registration & ownership caps, fee ceilings, market oversight powers, and the market coupling framework now being rolled out.

FAQs

Is market coupling live yet? No. It remains in a shadow-pilot/simulation phase run by Grid India. The Draft Second Amendment, 2026 would make Grid India the sole permanent Market Coupling Operator, but it has not been notified.

What did the Supreme Court decide on 3 August 2026? It dismissed a legal challenge to market coupling brought by IEX as premature, without ruling on the merits. CERC told the Court notification of the Second Amendment was 4–6 weeks away — a window that has since passed with no Sl. No. yet assigned.

Which commencement date should I cite for PMR 2021? 15 August 2021 (Gazette No. 327). The regulation was notified 15 February 2021 and published in the Gazette on 16 June 2021 (No. 241), but it came into force on 15 August 2021.

What's the fee cap for exchanges and facilitators? Both the transaction fee and the Facilitator service charge are capped at 2 paise/kWh (Regs. 23–24).

Ready-made kits: 📄 PPT Deck (PDF, Free) 📄 One-Pager (PDF, Free) Premium members get the editable files below. Upgrade to unlock → You must be logged in to view this content.
CERC Sl. No. 187
Tariff · Effective 01.04.2024 – 31.03.2029

Terms and Conditions of Tariff Regulations, 2024

Governs tariff determination for Thermal, Hydro, Transmission and Integrated Mine assets owned/controlled by Government companies, for the 6th control period.

FAQs

What are Tariff Regulations? The primary regulations for determination of tariff of Thermal Stations, Hydro Stations, Transmission Systems and Integrated Mines owned/controlled by Govt. companies, under Section 62 read with Section 79 of the Electricity Act.

What is the control period? Five years, except the first (3 years). Currently in the 6th control period, 2024–29. Earlier periods: 2019–24, 2014–19, 2009–14, 2004–09, 2001–04.

Ready-made kits: 📄 PPT Deck (PDF, Free) 📄 One-Pager (PDF, Free) Premium members get the editable files below. Upgrade to unlock → You must be logged in to view this content.
CERC Sl. No. 192
DSM · Effective 16.09.2024 (phased through 23.12.2024) · Third Amendment effective 31.08.2026

Deviation Settlement Mechanism & Related Matters Regulations, 2024

Latest DSM framework, rolled out in phases through 2024 and amended three times since — refining settlement charges, timelines, and infirm-power treatment (thermal, and now standalone storage), the deviation-computation value “X” for Wind & Solar sellers, and — per the Third Amendment, 2026 — a new WS/General-Seller parity rule and a Pumped Hydro deviation rate.

FAQs

Where did DSM come from? Originally Unscheduled Interchange Charges, folded into Tariff Regulations (2004–09, 2009–14). Split into standalone DSM Regulations in 2014, with a major structural update in November 2015 for renewable generators.

Why so many effective dates? The 2024 regulation was rolled out in stages: most provisions took effect 16.09.2024, Regulation 8(8) (deficit recovery from the Deviation & Ancillary Service Pool) followed on 01.12.2024 and then 23.12.2024 once the Detailed Procedure was approved (15.10.2024). The First Amendment (Dec 2024) and Second Amendment (notified 25.06.2025, gazetted 02.07.2025) followed, the latter letting thermal generators recover infirm power at the Normal Rate of Charges for Deviations, capped at ₹2.86/kWh. Most recently, a Commission order dated 31.03.2026 fixed the deviation-computation value “X” for Wind & Solar sellers from 01.04.2026.

What changed in the Second and Third Amendments? The Second Amendment (notified 25.06.2025, gazetted 02.07.2025, effective 01.07.2025) let thermal generating stations recover infirm power — from first synchronisation to successful trial-run completion — at the Normal Rate of Charges for Deviations, capped at ₹2.86/kWh (Regulation 8(8)). The Third Amendment (notified 25.08.2026, effective 31.08.2026) made four further changes: a WS/General-Seller parity rule under which a Wind & Solar Seller is treated as a General Seller for deviation if its project is bid/tendered on or after 01.01.2027, or (for non-bid projects) commissioned on or after 01.01.2029 (new Clause 4A, Regulation 8); a dedicated deviation rate for standalone Pumped Hydro Storage Projects, set at the energy charge rate under Regulation 66(3) of the CERC Tariff Regulations, 2024, in place of a contract rate; infirm-power compensation for standalone Energy Storage Systems, at the Normal Rate capped at ₹2.00/kWh (new Clause 2A, Regulation 8); and payment-timeline flexibility under Regulation 10, letting a Commission-approved Detailed Procedure set an alternative to the default 10-day payment window.

Ready-made kits: 📄 PPT Deck (PDF, Free) 📄 One-Pager (PDF, Free) Premium members get the editable files below. Upgrade to unlock → You must be logged in to view this content.
CERC Sl. No. 168
DSM · Effective 05.12.2022

Deviation Settlement Mechanism & Related Matters Regulations, 2022

Superseded by the 2024 regulations above — retained here for reference on POSOCO's normal-rate methodology and related CERC orders.

FAQs

Is this still in force? No — superseded by the DSM Regulations, 2024 (Sl.no.192) above. Kept here as an archive since several 2022-era CERC orders still reference it.

Ready-made kits: 📄 PPT Deck (PDF, Free) 📄 One-Pager (PDF, Free) Premium members get the editable files below. Upgrade to unlock → You must be logged in to view this content.
CERC Sl. No. 167
Ancillary Services · Effective 05.12.2022 (TRAS w.e.f. 01.04.2023)

Ancillary Services Regulations, 2022

Framework for procurement, deployment and payment of ancillary services at regional and national level, to hold grid frequency near 50 Hz and relieve transmission congestion. PRAS and SRAS came into force 05.12.2022; TRAS (Regulations 6, 14–19, 20–22 & 26) followed on 01.04.2023.

FAQs

What is ancillary services in power generation? Functions that help grid operators maintain a reliable system — managing the flow and direction of electricity, addressing supply-demand imbalances, and helping the grid recover after an event.

What types are covered, and when did each take effect? Primary (PRAS) and Secondary (SRAS) reserve ancillary services took effect 05.12.2022; Tertiary (TRAS) followed on 01.04.2023 once its Detailed Procedure was finalised. Other services such as voltage control and black start are specified separately in the Grid Code.

Ready-made kits: 📄 PPT Deck (PDF, Free) 📄 One-Pager (PDF, Free) Premium members get the editable files below. Upgrade to unlock → You must be logged in to view this content.
CERC Sl. No. 172
REC · Effective 05.12.2022 (as amended 24.03.2026)

Renewable Energy Certificates — Terms & Conditions Regulations, 2022

Supersedes the 2010 REC Regulations; removes the forbearance and floor price ceiling for RE Certificates. Amended in 2026 to recognise Virtual PPAs and overhaul the Certificate Multiplier.

FAQs

What changed from the 2010 regulations? CERC notified these on 09.05.2022 in supersession of the 2010 REC Regulations, removing the forbearance and floor price ceiling that previously capped and floored REC prices.

What changed in the First Amendment, 2026? It recognises Virtual Power Purchase Agreements for the first time (new Regulation 14A), widens which self-consumption plants qualify as captive, shifts the REC application deadline for obligated entities to the State Commission's certification date, and replaces the old tariff-only Certificate Multiplier with a 3-factor weighted score — raising the multiplier for offshore wind (4.0x) and storage/firm technologies (3.0x).

Ready-made kits: 📄 PPT Deck (PDF, Free) 📄 One-Pager (PDF, Free) Premium members get the editable files below. Upgrade to unlock → You must be logged in to view this content.
CEA Sl. No. 208
Metering · Effective 01.04.2026 (Fifth Amendment)

Installation and Operation of Meters — Fifth Amendment Regulations, 2026

Refines the 2019 Smart Meter mandate and 2022 AMI/AMISP framework: all Advanced Metering Infrastructure must now include prepayment and interoperability, and a Smart Meter of accuracy class 1.0/0.5S can double as the Interface Meter for open-access consumers at or below 650 V.

FAQs

What does the 2026 Amendment actually change? It rewrites Regulation 4(1)(b) so all Advanced Metering Infrastructure must include prepayment functionality and be interoperable, and lets a Smart Meter of accuracy class 1.0/0.5S double as the Interface Meter for open-access consumers at or below 650 V. It also splits Regulation 7's Table-1 (Sl. No. 4 & 5) cleanly at the 650 V threshold for Main/Check Meter placement.

Is the 10 April 2026 Corrigendum a substantive change? No — it's a Hindi-text translation fix and an English typo correction (“pentries” → “entries”) only. The 1 April 2026 operative rules are unchanged in substance.

Ready-made kits: 📄 PPT Deck (PDF, Free) 📄 One-Pager (PDF, Free) Premium members get the editable files below. Upgrade to unlock → You must be logged in to view this content.
CEA Sl. No. 209
Cyber Security · Effective 01.04.2027

Cyber Security in Power Sector — CEA Regulations, 2026

India's first sector-specific cyber security framework for the power system: mandatory CISO/Alternate CISO governance, physical OT/IT segregation, 6-hour incident reporting to CSIRT-Power & CERT-In, annual audits and vendor cyber security obligations — for entities that own, operate or manage OT/IT infrastructure tied to the grid, generation, captive plants and ESS at or above 50 MW.

FAQs

Who does this regulation apply to? Generating companies, captive generating plants & Energy Storage Systems with installed capacity ≥ 50 MW, transmission & distribution licensees, National/Regional/State Load Despatch Centres, and power exchanges/OTC platforms (except Regulations 6, 11 & 12) that own, operate or manage OT infrastructure tied to the interconnected power system, plus their connected IT infrastructure. Entities below 50 MW are encouraged, not mandated, to adopt CERT-In's "15 Elemental Cyber Defense Controls for MSMEs" as a minimum baseline.

What are the key compliance timelines? Cyber security incidents must be reported to CSIRT-Power and CERT-In within 6 hours (24 hours for confirmed cyber sabotage of critical systems). Cyber security audits must be completed within 6 weeks of commencement, with critical/high-risk findings fixed within 1 month and medium/low-risk findings within 3 months. The regulations come into force from 1 April 2027, though select sub-regulations (5(9), 5(24), 5(33), 5(39), 6(2), 6(7)) commence on dates to be separately notified.

Ready-made kits: 📄 PPT Deck (PDF, Free) 📄 One-Pager (PDF, Free) Premium members get the editable files below. Upgrade to unlock → You must be logged in to view this content.
CEA Sl. No. 210
Flexible Operation · Effective 30.01.2023

Flexible Operation of Coal-based Thermal Power Generating Units — CEA Regulations, 2023

Mandates minimum turndown to 40% of Maximum Continuous Rating (interim 55% within one year of notification) and graded ramp-rate capability of 1–3% per minute across load bands, for every coal-based thermal generating unit connected to the grid — with Authority-directed phased timelines and case-by-case relaxation power.

FAQs

Who does this regulation apply to? All coal-based thermal power generating units connected to the grid — whether owned or controlled by the Central Government, State Governments, or any private company — and the load despatch centres responsible for scheduling them, covering both existing and new units.

What are the key compliance timelines? Units must achieve a minimum power level of 40% of Maximum Continuous Rating (MCR) without oil support, with units not yet compliant required to reach an interim 55% MCR within one year of notification (30 January 2023). Ramp rates must reach at least 3%/min between 70–100% MCR, 2%/min between 55–70% MCR, and 1%/min between 40–55% MCR (phased), with the Authority prescribing unit-wise implementation timelines and case-by-case relaxations by reasoned order.

Ready-made kits: 📄 PPT Deck (PDF, Free) 📄 One-Pager (PDF, Free) Premium members get the editable files below. Upgrade to unlock → You must be logged in to view this content.
CEA Sl. No. 211
Technical Standards · Effective 01.04.2027 (2026 RE+BESS Amendment)

Technical Standards for Construction of Electrical Plants & Electric Lines — CEA Regulations, 2022 (as amended 2025 & 2026)

Core construction standards for generating stations, sub-stations and electric lines (2022), tightened by the 2025 amendment standardising Right-of-Way values under a rebuilt Schedule VII, and expanded by the 2026 amendment's new Chapter VI (Regs 106A–106ZS) setting dedicated technical standards for solar, wind and Battery Energy Storage System (BESS) installations.

FAQs

Who does this regulation apply to? Generating companies, transmission & distribution licensees, CTU and STUs building or operating electrical plants, sub-stations, switchyards and electric lines (2022 base). From the 2026 amendment, the same technical-standards discipline extends to solar (including floating solar), onshore & offshore wind, and BESS developers — covering Parts A, A1, B, B1 and C of the new Chapter VI.

What changed across the three notifications? The 2022 base regulation lays down chapter-wise standards for General, Thermal, Hydro-Electric, Sub-stations & Switchyards, Electric Lines and HVDC works. The 2025 amendment substitutes Schedule VII with Right-of-Way values keyed to voltage class, conductor, terrain and approach-section — any new conductor configuration or technology needs separate CEA approval. The 2026 amendment inserts Regulations 106A–106ZS, mandating ≥25-year design life, AWS & PMU integration, and use-case-specific technical requirements for RE and BESS assets (including AGC, grid-forming inverters and black-start capability for BESS ≥50 MW), coming into force 1 April 2027.

Ready-made kits: 📄 PPT Deck (PDF, Free) 📄 One-Pager (PDF, Free) Premium members get the editable files below. Upgrade to unlock → You must be logged in to view this content.

Tracking a regulation not listed here? Tell us what to add — or go Premium for ready-made PPT and editable kits on every entry.

Scroll to Top